Ferrovial, in a joint venture (JV) with BAM, has been selected for three contracts to design and build 140 miles of track infrastructure for the High-Speed 2 (HS2) rail project in the UK.
Results that may be inaccessible to you are currently showing.
Hide inaccessible results